$0M
Project Value
0
Square Meters
0
Project Phases
State-of-the-art logistics and distribution center with automated sorting systems, 40-dock truck court, and 15MW rooftop solar array.
The Challenge
Coordinating construction of a 180,000 sqm facility while integrating complex automated systems from three different technology vendors.
Our Solution
Implemented a digital twin of the entire facility for clash detection and sequencing, reducing RFIs by 60% and enabling parallel workstreams.
Project Timeline
Earthworks & Foundation
completedGrading, utilities, and slab-on-grade
Steel Structure
completedPre-engineered metal building erection
Envelope & Roofing
in progressWall panels, roofing, and solar installation
MEP & Automation
plannedMechanical, electrical, and automated systems
Commissioning
plannedTesting and client handover
Key Materials
Pre-Engineered Metal BuildingReinforced Concrete Slab (500mm)Solar Panels (15MW)Automated Conveyor SystemsFire-Rated Steel Decking